A tilt-and-turn order needs more than width, height and colour. Inward opening, dual-mode hardware and project-specific safety provisions make ambiguity expensive. Issue one controlled schedule that records how every dimension and opening direction has been interpreted. Compare the available made-to-measure options on our relevant trade window supply page.

Build an unambiguous window schedule
State whether dimensions are structural-opening, survey or manufacturing sizes, and never expect the fabricator to infer deductions. Confirm the viewed-from convention in writing. Coordinate the full turn arc with deep reveals, handles, blinds and furniture; then identify where restrictors, guarding or special risk controls are part of the design. Specify whole-window performance rather than relying on centre-pane values, and obtain product evidence for the exact system and configuration.
| Schedule field | What to record | Why it matters |
|---|---|---|
| Size basis | Width, height, units and whether manufacturing size | Prevents undocumented deductions |
| Operation | Viewed-from convention, hinge side, handle position and opening modes | Avoids reversed or unusable sashes |
| Interfaces | Cill, frame extensions, couplers, trims and fixing substrate | Coordinates the frame with the opening |
| Performance | Glazing, safety glass, ventilation, acoustic and security requirements | Allows the supplier to select a tested configuration |
Pre-order and site checklist
- Survey each opening and flag irregular masonry or out-of-square conditions.
- Send elevations with unique window references and a written viewing convention.
- Check internal swing clearance and access for installation and delivery.
- Approve the final schedule and drawings; record revisions instead of relying on phone calls.
For the survey stage, use our related Trade Windows Scotland guide. The installed-project perspective is illustrated by Clyde Windows & Construction’s matching service.
Coordinate the details that drawings often miss
Deep ingoes can prevent a full turn opening even when the frame fits the structural opening. Internal boards, curtain tracks and blinds can obstruct the handle or sash; external cills and frame extensions can alter the installation line. Confirm how drainage remains clear and whether coupled frames need project-specific support. For phased work, include plot, floor and room references on labels and agree the loading order. If the supplier raises a query, add the answer to the schedule revision: an email or phone call that is not reflected in the approved document can be lost between estimating, fabrication and site.
Evidence and sign-off
Requirements vary with building type, occupancy, warrant date, product system and contract responsibility. Check current primary guidance rather than carrying assumptions from a previous job. Useful source points are April 2026 Scottish domestic technical handbook, Eurocell specification sheets, BFRC product certification guidance. Where a standard, system manual or approved project detail is more specific, that document takes precedence.
Before manufacture, name the person responsible for dimensions, appearance, regulatory design and final approval. Before installation, verify labels and condition against the approved schedule. Record departures as controlled changes so that the fabricated product, site opening and completion evidence remain aligned.